01
How long does a project take?
A brand site is typically two to four weeks; a store or an app, six to twelve. Content through The Machine starts inside a week. Generative production is why those numbers are shorter than an agency quotes — a campaign that needed a shoot week is days of art direction instead. You get the actual dates in writing with the quote, before anything starts.
